CBT Addition

  • strict warning: Non-static method view::load() should not be called statically in /home4/thomasd8/public_html/sites/all/modules/contrib/views/views.module on line 906.
  • strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /home4/thomasd8/public_html/sites/all/modules/contrib/views/handlers/views_handler_filter.inc on line 607.
  • strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /home4/thomasd8/public_html/sites/all/modules/contrib/views/handlers/views_handler_filter.inc on line 607.
  • strict warning: Declaration of views_handler_filter_boolean_operator::value_validate() should be compatible with views_handler_filter::value_validate($form, &$form_state) in /home4/thomasd8/public_html/sites/all/modules/contrib/views/handlers/views_handler_filter_boolean_operator.inc on line 159.
  • strict warning: Declaration of views_plugin_style_default::options() should be compatible with views_object::options() in /home4/thomasd8/public_html/sites/all/modules/contrib/views/plugins/views_plugin_style_default.inc on line 24.
  • strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home4/thomasd8/public_html/sites/all/modules/contrib/views/plugins/views_plugin_row.inc on line 134.
  • strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /home4/thomasd8/public_html/sites/all/modules/contrib/views/plugins/views_plugin_row.inc on line 134.
  • strict warning: Non-static method view::load() should not be called statically in /home4/thomasd8/public_html/sites/all/modules/contrib/views/views.module on line 906.

2001

Thomas Crane Public Library CBT AdditionIn October 2001 the Thomas Crane Public Library completed a three-year expansion, renovation and restoration project. The project was carried out in two phases: the first, the renovation of the 1938 Coletti addition and the construction of a 55,000 square foot new addition; the second, the restoration of the 1882 National Historic Landmark H. H. Richardson building and its 1907 Aiken wing.

Architect Richard Bertman and his team from CBT/Childs Bertman Tseckares Inc. of Boston, Mass. designed the new addition constructed of granite, brick and brownstone, with the distinctive red slate roof. This addition incorporates aluminum arches, balconies and windows in a contemporary interpretation of Richardson's Romanesque style. Organized around a three-story atrium, the addition more than doubles the library space.

Working from old photographs, CBT directed the restoration of the Richardson building, repainting the walls, recreating period light fixtures, and restoring the yellow pine woodwork and wide planked floors. The remaining tables and chairs designed by Richardson were restored and put back into use for the public to enjoy.

The project was funded by the City of Quincy, with grants from the Massachusetts Board of Library Commissioners, the Massachusetts Historical Commission and nearly $1 million in private donations.

In January 2002 the library was awarded the Mass Architectural Access Board's 2001 Honor Award for Accessible Design in Public Architecture. In May 2002 the library received a Mass. Historical Commission 2002 Historic Preservation Award.

For more information and photographs of the CBT renovation and restoration project, read the library's October 14, 2001 Dedication Booklet.

Dedication Booklet


© 2011 Thomas Crane Public Library

Developed by Isovera, Inc.